Yang mei shan viaduct (photo: sumitomo mitsui construction (strains))

Support new name god project PC steel technology ~ armory, Yang mei shan chuan bridge, AnWeiChuan bridge viaduct ~

Yang mei shan viaduct (photo: sumitomo mitsui construction (strains))

1000 tons of high strength PC steel supply in time

32 car mobile operation and construction of large projects

Roll on the drum of PC steel is inserted to the bridge (photo: sumitomo mitsui construction (strains))
Roll on the drum of PC steel is inserted to the bridge (photo: sumitomo mitsui construction (strains))

Yang mei shan viaduct, TDD is has long line bridge are the grow up of more than 1100 m Bridges.Used in the construction site and AnWeiChuan same mobile vehicle bridge and armory sichuan bridge in cantilever construction, in addition, it also has unique huge project.Is responsible for the design and construction of sumitomo mitsui construction (strains) of health a surname.

Sumitomo mitsui construction (strains) health a surname
Sumitomo mitsui construction (strains) health a surname

"The bridge, is in the peak period will usually use 10 mobile operations around car increased to 32 m, at the same time, the construction of large projects.Don't allow any mistake during construction at the same time.A point to stop the construction, influence to the whole process.This is the requirement of high ability of site construction engineering.In addition the construction progress is indispensable in the supply of PC steel effectively and quickly"

USES the system in a timely manner, to provide high strength PC steel construction site

Although PC steel effectively and quickly supply is absolutely mission, but in large-scale yangmei hill viaduct project, the high strength PC steel consumption of up to 1000 t.Sumitomo electric steel of high strength PC total shipments of 3000 t/a decade, from this numerical value can also be seen its scale.In addition, the PC is no steel production and transportation is enough.In the construction site there is no such a large number of goods storage sites, so you must do it "in the necessary time, provide the necessary amount".As shown in literal meaning, need to introduce system in a timely manner.In response to a request for the possibility of accidental events in the land transport also has carried on the forecast, formulate the detailed production and transportation planning, according to the progress of the construction of transportation control.

"The supply of PC steel work done very in position.I think this is all thanks to the two companies after the trust relationship.Subject is a construction site in the future PC machine material surrounding the miniaturization and lightweight.For large-scale construction, as a result of the overall volume will increase, so I think this response will be an opportunity to raise the productivity of the construction site.Sumitomo electric staff together, and I hope to completely change the innovation of the construction site "(the piece's)

Support new sumitomo electric god highway bridge projects in the name of the young workers
Support new sumitomo electric god highway bridge projects in the name of the young workers

Starting from the left
Kishi on sweet (responsible for new technology development of high strength PC steel)
"I am responsible for the high strength PC steel new technology development.In the future will also be for production technology innovation and new product development efforts"

Upper middle JinZhi (responsible for fixed PC steel parts design and development)
"I am responsible for PC steel fixed parts design and development.Helps to improve PC construction technology of the new technology being developed is my goal"

In the valley is history (in charge of the business yangmei hill viaduct and product management)
"I am in charge of the business yangmei hill viaduct and product management.From bridge piers built when beginning, I have been involved, therefore is also deeply touched"

Show a tanaka (responsible for the high strength PC steel production technology and production)
"I am responsible for the high strength PC steel production technology and production.Can make contributions to products on the market greatly popular, as a technical personnel, feel work is very valuable"

NEXT

To ensure that Bridges the sanity by cable
Pavilion viaduct highway, month ~ ~ Renaissance support

(5)